top of page

SG-WIND: Case Study ③

SANKO GOSEI

Case Study Gas Burn Prevention

Issue: Burnout at final filling position (0.5h of mold maintenance every 500 shots)

Countermeasure: Check the effect of air venting by SGEP.

Conclusion: Effective.

Consideration: SGEP was installed 7 to 10 mm away from the burn position.

The amount of air that did not lead to burning before final filling could be reduced, and as a result, contributed to reducing burning.



26 views0 comments

Comentarios

Obtuvo 0 de 5 estrellas.
Aún no hay calificaciones

Agrega una calificación

Concerns about plastics
Did you solve?

You can find the desired content from the
top page content from the top page.

23989485.png

★月間アクセスランキング★

bottom of page